Get A Free Quote

READY TO GET STARTED WITH YOUR PROJECT?

Albarrie's Sorbweb Secondary Containment installations in British Columbia

THANK YOU FOR CHOOSING ALBARRIE

Speak with an Albarrie containment expert about your project by filling out the form. You can upload supporting documents such as a geotechnical report, photos, and drawings or a request for quote package. 

Albarrie’s secondary oil containment design packages include stamped final designs, detailed final reports, and as-built drawings. We design our secondary containment solutions to be passive and maintenance-free, allowing drivable access to the equipment. 

Typical Design Guidelines and Input Data Needed

  • Standard 110% Containment plus a 1-in-25-year return, 24 hours after a rainfall event
  • IEEE Guidelines for Secondary Oil Containment
  • SPCC Rules/MOE Requirements
  • Best Engineering Practices
  • Site Considerations
  • Client Specifications
  • Site Plan Drawing
  • Transformer Foundation Design
  • Volume Of Oil
  • Soil Permeability (A Geotechnical Report Is Best)
  • Depth Of Grounding Grid
  • Geographic Location
  • Deluge System if any
  • Number Of Intrusions in The Containment Area
  • Pieces Of Oil-Filled Equipment Needed
  • Equipment Layout
  • Grading Plan
Fields marked with * are required.

Get A Free Quote!

Name(Required)
Consent(Required)
Drop files here or
Max. file size: 20 MB.
    User Privacy & Terms of Use

    Understand how your data is used by Albarrie by reading our privacy statement.