What Happens If We Ever Need To Change Out The Transformer?

Can we jack and roll the transformer if the SorbWeb Plus system is installed? 

Yes, you must consult with a civil engineer to design the jack and roll process and limit the transferred loading to 75 kPa and 100 kPa serviceability limit state (SLS) bearing capacity for earth berms constructed with a cohesive and a noncohesive soils, respectively.