The containment must be protected from frost heave as per geotechnical engineering recommendations. The containment system is designed to accommodate normal footing differential and total settlement of 15 and 25mm, respectively; if the site is under severe settlement effects, a geotechnical engineer must be consulted for remediation action (site preloading, soil stabilizations,…etc.) prior to installations.